Present: QQ BP GLB TB MM PB AD BR SL JLP(remote)
JIRA page: a system with task and subtask exist. Why the COLD project request is more complicated? May be not the correct system used? B.Roche suggest to also have a overall JIRA followup for the COLD project. PB prefers not to use this system
Confluence page should be populated with WP subpages and links to meetings
GLB: what is the weigth of the QCM? --> ACTION: ask to SLAC
Crane in PINJ modulator hall will be likely needed
QQ suggests to plan either an IPAC satellite meeting or a review just after IPAC concerning COLD project. ASD would finance such meeting. -- > ACTION: ask JLRevol
GLB high charge small emittance short pulse lenght could be usefull for experiments also at low repetition rate. To be discussed with MECouprie (SOLEIL)
PB remind that 4microsecond modulator is a risk factor. Canon migth not succeed to produce it.
wave guide switches missing are not an issue. Can be replaced by WG components to be installed by hand.
laser water cooling requirement -- > ACTION ask INFN
PB ADE: water cooling and grounding are critical and urgent needs. presently no grounding in PINJ
ADE: BOC will need temperature regulation, more demanding than for PSI that has a stabilized temperature in the tunnel
BP: why DESY flange is better? PB it is best option for ultra high vacuum waveguides.
JLP: ethernet connected equipment should be considered no phisical machines. only for special cases such as FPGA
No news on resources