1st COLD meeting

Europe/Paris
CTRM meeting room

CTRM meeting room

Present: QQ BP GLB TB MM PB AD BR SL JLP(remote)

JIRA page: a system with task and subtask exist. Why the COLD project request is more complicated? May be not the correct system used? B.Roche suggest to also have a overall JIRA followup for the COLD project. PB prefers not to use this system

Confluence page should be populated with WP subpages and links to meetings

GLB: what is the weigth of the QCM? --> ACTION: ask to SLAC

Crane in PINJ modulator hall will be likely needed

QQ suggests to plan either an IPAC satellite meeting or a review just after IPAC concerning COLD project. ASD would finance such meeting. -- > ACTION: ask JLRevol

GLB high charge small emittance short pulse lenght could be usefull for experiments also at low repetition rate. To be discussed with MECouprie (SOLEIL)

PB remind that 4microsecond modulator is a risk factor. Canon migth not succeed to produce it.

wave guide switches missing are not an issue. Can be replaced by WG components to be installed by hand.

laser water cooling requirement -- > ACTION ask INFN

PB ADE: water cooling and grounding are critical and urgent needs. presently no grounding in PINJ

ADE: BOC will need temperature regulation, more demanding than for PSI that has a stabilized temperature in the tunnel

BP: why DESY flange is better? PB it is best option for ultra high vacuum waveguides.

JLP: ethernet connected equipment should be considered no phisical machines. only for special cases such as FPGA

No news on resources

 

There are minutes attached to this event. Show them.
    • 1
      general project update
      Speaker: Simone Liuzzo (ESRF)
    • 2
      RF
      Speaker: Alessandro D'Elia (ESRF)
    • 3
      WP status round table

      WP 01 RF
      WP 02 Diagnostics
      WP 03 Vacuum
      WP 04 Mechanical Engineering
      WP 05 Infrastructure
      WP 06 Operation
      WP 07 Control
      WP 08 Alignment
      WP 09 Safety
      WP 10 Magnets
      WP 11 Beam Dynamics

    • 4
      AOB

      changed tasks in WPs Diagnostics, Safety and Mechanical Engineering

      Human resources? Diag, RF?