Change of name (COLD = Cool copper Operation Linac Driver)
WP 01 RF
WP 02 Diagnostics
WP 03 Vacuum
WP 04 Mechanical Engineering:
WP 05 Infrastructure
WP 06 Operation
WP 07 Control
WP 08 Alignment
WP 09 Safety (P.C.: meeting scheduled with FLUKA expert for ASNR documentation)
WP 10 Magnets
WP 11 Beam Dynamics
CFT
discussion about diagnostic+dump to be used for linac refurbishment and cold project
beam size
energy
emittance
bunch length
beam losses
current
beam dump
informations needed for feasibility study
Please fill this document or write to S.Liuzzo:
https://cloud.esrf.fr/apps/files/files/16443002?dir=/COLD/WP05%20Infrastructure&openfile=true
COLD project set up multi particle tracking simulations
Conceptual Design Report:
https://www.overleaf.com/7899755955tmcgtsjgcdkt#10571a
JIRA planning
https://jira.esrf.fr/secure/PortfolioPlanView.jspa?id=26&sid=26&vid=0#plan/backlog
LTSP document:
https://www.overleaf.com/read/nsvfrbjwfykb#effb67
List of pending action:
https://confluence.esrf.fr/display/PROJCOLD/Meeting+notes
As requested by the SLAC colleagues, An abstract is submitted and accepted for a talk at the LCWS workshop in October, Valencia:
https://agenda.linearcollider.org/event/10594/abstracts/
check Pending Actions list from previous meetings
https://confluence.esrf.fr/display/PROJCOLD/COLD%3A+Cool+copper+Operation+Linac+Demonstrator