14th COLD meeting
CTRM
-
-
1
general project updateSpeaker: Simone Liuzzo (ESRF)
-
2
WP status round table
WP 01 RF
WP 02 Diagnostics
WP 03 Vacuum
WP 04 Mechanical Engineering: image from TB
WP 05 Infrastructure (planned works for SD 2026)
WP 06 Operation
WP 07 Control
WP 08 Alignment
WP 09 Safety
WP 10 Magnets
WP 11 Beam Dynamics
WP 12 TimingSpeakers: Alessandro D'Elia (ESRF), Hugo Pedroso Marques (ESRF), Marc Dubrulle, Pawel Borowiec (ESRF), Reynald Bourtembourg (ESRF), Simone Liuzzo (ESRF), Yann Gouez (ESRF) -
3
shutdown activities
Co-activity October SD: grounding and cranes installation
priority to S-band RF-unit grounding and crane.
Cranes can be installed during USM?
Speaker: Isabelle Leconte -
4
Review CDR document
Conceptual Design Report:
https://www.overleaf.com/7899755955tmcgtsjgcdkt#10571a -
5
Planning and budget review
PLEASE SPEND what is needed to have items needed for Phase 0 (July 2027).
Use COLD budget CODES.
If possible, send to SL a planning for each item as in A.D'Elia presentation at the review panel.
Speaker: Simone Liuzzo (ESRF) -
6
Human resources
welcome:
- PhD beam dynamics (3rd Aug 2026)hiring in progress:
- LLRF (interviews)
- MEGplanned:
- COD: RF (papers ready for DM) -
7
AOB
Collaborations:
frame contract INFN signed!
frame contract PSI signature in progress!Addenda drafts (for COLD activities) are agreed with the partners and need to be written and signed.
No news on SLAC collaboration contract
Electrical cabinets soon to be purchased
Faraday cage removal. Any News?
Installation of cranes can take place during USM?
COLD Network meeting 2nd September 2026
EIC-pathfinder-OPEN project (reply in October)
-
8
update confluence page
check Pending Actions list from previous meetings
(MIND confluence will disappear, we should consider alternatives. Own cloud already in place. Indico for meeting minutes.)
https://confluence.esrf.fr/display/PROJCOLD/COLD%3A+Cool+copper+Operation+Linac+Demonstrator
-
1