COLD Network
CTRM
Notes COLD network meeting
present:
SL
JLR
RB
ADE
TB
CB
PB
Fernando Calvelo
Discussion:
All needs in modulator hall.
JLR what is the status of the network in the area?
FCV 1 switch with 48 ports
PB must separate the two installations. New rack only for operation
JLR need connection for refurb and for COLD.
FCV can concentrate ports in the same rack
PB: no, would prefer to have it in the racks for the network
One rack is dedicated to network.
All plugs are copper.
Need fiber for timing
Whist has both fiber and copper.
Interlock are also copper
Distinguish copper/fiber plugs.
LN2 level for infrastructure
No fibers for control
Ask Friederike is need of fiber for diagnostics (ACTION)
Safety may need fiber (unlikely)
If need to distribute timing from ctrm to pinj, need of fiber.
FCV: Racks are a already there
NOT yet. Being purchased.
Will need installation for September 2027.
Budget line control or operation line
What needs to be done.
FCV: set arriving of fibers. (Similar) then buy 3 slots of switch (48 each). May need something special for safety.
ADE: Need dedicated cable tray?
FCV: existing cable trays are ok.
Need to work in shutdown?
JLR: sent request to Isabelle to work during shutdown.