2nd COLD meeting

Europe/Paris
CTRM meeting room

CTRM meeting room

present

AdE PB NB SL PC GLB FE BR TB LE RV QQ MM BJ JLR

 

Project COLD JIRA Plan presented: https://jira.esrf.fr/secure/PortfolioPlanView.jspa?id=26&sid=26&vid=0#plan/backlog

Names of WP responsibles will be added to manage the corresponding tasks.

SL will follow and update the dates in the planning

Project COLD JIRA Plan is free of charge. QQ  mentions that we can purchase a Microsoft Project licence if needed.

Project COLD JIRA Plan can export to Confluence

WP01 

presentation by A.D'Elia.

PB need to evaluate RF windows location. Venting may be more complicated in cryogenic environment.  A mistake when venting could pollute the structures. (post meeting note SL: one of the tasks of the project is to define a venting procedure)

PB evaluate also canon as successor of Toshiba for RF components and waveguides

Grounding to be discussed

PB UHV components for RF to be managed with Vacuum group. Need of a pumping station dedicated to the modulator hall. 

PB arcs could appear in vacuum. 

JLR SAT of RF unit on section 0. PB and A.D'E.: NO. SAT on dummy load.

JLR RF unit test in RF test stand. NO: not enough space

MM New RF unit can be placed neer modulator 3.

PB need to buy dummy load for RF unit tests with a separated RFQ. 

 

WP04: ask frascati for laser drawings

WP06: cleaning of linac modulator hall for refurbishemnt is complete. next step is preparation for COLD project

WP09: need to know dates of delivery of RF units for klystron X-ray source declaration

WP11: beam transport directly in the C-badn structures is difficult. need a small short laser spot on the cathod (Cu). Solution with S-band accelerating strucutres work better. more studies will follow.

AOB:

QQ, on Human resources. Directors are informed of the need of resources and will discuss of reorganization to dedicate resources to the project. 

 

 

There are minutes attached to this event. Show them.
    • 1
      general project update

      Collaboration Contract

      Speaker: Simone Liuzzo (ESRF)
    • 2
      JIRA / Confluence project setup
    • 3
      WP status round table

      WP 01 RF
      WP 02 Diagnostics
      WP 03 Vacuum
      WP 04 Mechanical Engineering
      WP 05 Infrastructure
      WP 06 Operation
      WP 07 Control
      WP 08 Alignment
      WP 09 Safety
      WP 10 Magnets
      WP 11 Beam Dynamics

      Speaker: Alessandro D'Elia (ESRF)
    • 4
      Planning and budget review
      Speaker: Simone Liuzzo (ESRF)
    • 5
      AOB

      Human resources? Diag, RF?

    • 6
      update confluence page

      check Pending Actions list from previous meetings