Choose timezone
Your profile timezone:
LN2 ALGE meeting
The day before going in calibration bench laboratory call ALGE.
Covering of calibration bench needed. Could use calibration bench
LN2 pipe will go as high to avoid installation, as low to minimize path.
Shutdown activités organization with ALGE.
Protection Woden structure with plastic to be designed by BIG.
message from David Martin (26/05/2026):
If there are any visits or inspections to the calibration bench, and whenever the works are scheduled: