    • 2:00 PM 2:05 PM
      general project update 5m

      COLD Project Review in 21st April 2026 with external advisors.

      Panel members (5-6):

      RF, photoinjectors, pulsed power:
      1) chair: Roberto Corsini (CERN) (CONTACTED, OK) Backup: Walter Wuensch (CERN)
      2) Tetsuo Abe (KEK) (CONTACTED), Backup: Florian Burkart (DESY, ARES), Patrick Alexandre (SOLEIL)

      CRYOGENICS:
      3) Donato Passarelli (FNAL) (CONTACTED, OK*) Backup: A. Ghribi (IN2P3).

      operation / diag / synchro / beam dynamics:
      4) Sara Thorin (MAX-IV) (CONTACTED, OK) Backup: Gerardo D'Auria (ELETTRA)

      Competitor 6GeV LINACS / LASER
      5) Wim Leemans (DESY) (CONTACTED, OK) Backup: Winfried Decking (EuXFEL)

      Agenda:

      8.45 welcome coffee

      9.00 (20+10) ESRF injectors upgrade overview (Qing Qin)

      9.30 (30+15) 6GeV linac and COLD project driver: beam dynamics and planning (Liuzzo)

      10.15 coffee break

      10.45 (30+15) Acc. Struct + cryomodule for C^3 and COLD (Nanni, Aymar, SLAC)

      11.30 (30+15) S-band brazing free high charge Photo electron gun and RF deflector (Alesini, INFN)

      12.15 LUNCH (ESRF canteen private room)

      13.45 (20+10) RF power and distribution (R.Zennaro, PSI, A.D'Elia, ESRF)

      14.15 (20+10) installation, implementation and safety aspects (J-L Revol)

      14.45 (20+10) Diagnostics and Laser (F.Ewald)

      15.15 coffee break

      15.30 (60) review writing

      17.30 (15) final review return and closing remarks

      19.00 DINNER

      Speaker: Simone Liuzzo (ESRF)
    • 2:05 PM 2:10 PM
      WP status round table 5m

      WP 01 RF
      WP 02 Diagnostics
      WP 03 Vacuum
      WP 04 Mechanical Engineering:
      WP 05 Infrastructure
      WP 06 Operation
      WP 07 Control
      WP 08 Alignment
      WP 09 Safety
      WP 10 Magnets
      WP 11 Beam Dynamics
      WP 12 Photons

    • 2:10 PM 2:15 PM
      Review CDR document 5m

      Conceptual Design Report:
      https://www.overleaf.com/7899755955tmcgtsjgcdkt#10571a

      OK means it is OK for the moment but you are fully free to modify correct, reference add figures, etc..

      WP 01 RF OK
      WP 02 Diagnostics OK
      WP 03 Vacuum waveguides?
      WP 04 Mechanical Engineering
      WP 05 Infrastructure Please check text
      WP 06 Operation Add reliability, maintainability, repeatability
      WP 07 Control OK, interlocks to be added
      WP 08 Alignment OK
      WP 09 Safety some text, please complement
      WP 10 Magnets OK
      WP 11 Beam Dynamics missing several simulations

    • 2:15 PM 2:17 PM
      Planning and budget review 2m

      JIRA planning (OUTDATED)
      https://jira.esrf.fr/secure/PortfolioPlanView.jspa?id=26&sid=26&vid=0#plan/backlog

      New: Microsoft Project planning
      more tasks
      more budget
      additional items (RF-deflector, Water cooling,...)

      CAN IT BE IMPORTED TO JIRA?

      Speaker: Simone Liuzzo (ESRF)
    • 2:20 PM 2:22 PM
      Human resources 2m

      2 COD position being opened
      - LLRF
      - RF

    • 2:30 PM 2:35 PM
      AOB 5m

      Collaborations

      EIC-pathfinder-OPEN project

    • 2:45 PM 2:46 PM
      update confluence page 1m

      check Pending Actions list from previous meetings

      https://confluence.esrf.fr/display/PROJCOLD/COLD%3A+Cool+copper+Operation+Linac+Demonstrator